Project Solutions

Precision models. Zero-clash execution.

Explore LOD 400 coordination and clash resolution across multi-million dollar commercial developments. We embed veteran field engineers into the drafting workflow to guarantee zero-clash models.

Proven accuracy

Precision by the numbers

0

Field clashes detected

100%

LOD 400 accuracy rate

14 days

Saved per project phase

High-resolution screenshot of a complex MEP and structural BIM model, sharp focus, technical wireframe overlays, cool blue lighting
High-resolution screenshot of a complex MEP and structural BIM model, sharp focus, technical wireframe overlays, cool blue lighting
Finished modern commercial building interior showing exposed structural steel and MEP systems matching the digital model, high-contrast lighting
Finished modern commercial building interior showing exposed structural steel and MEP systems matching the digital model, high-contrast lighting
Detailed BIM model of complex industrial piping and HVAC systems, blueprint-blue background, high-contrast lines, sharp focus
Detailed BIM model of complex industrial piping and HVAC systems, blueprint-blue background, high-contrast lines, sharp focus
Completed industrial facility interior showing complex piping and HVAC systems, cool-toned studio lighting, sharp focus, 35mm
Completed industrial facility interior showing complex piping and HVAC systems, cool-toned studio lighting, sharp focus, 35mm
/ Selected Works

Coordinated to build

High-precision digital coordination models paired with their physical counterparts, showcasing clash-free execution from initial scan to final structural handoff.

Commercial Hub model

Commercial Hub build

LOD 400 coordination resolving over three hundred structural clashes prior to concrete placement, saving weeks of on-site modifications.

The completed physical structure matching the digital twin with zero field modifications, proving the value of field-ready coordination.

Industrial Facility model

Industrial Facility build

Laser-scan-to-BIM conversion providing absolute dimensional accuracy for retrofitting complex MEP systems in a live operational environment.

Prefabricated piping systems installed with millimeter precision, eliminating on-site rework and ensuring ISO 19650 compliance throughout the build.

Ready for field-ready coordination?

Submit your architectural plans for an LOD 400 constructability review and secure field-ready coordination for your next complex commercial build.